One element that has failed, set against what was actually required of it.
A defect investigation is measured against the approved drawings and engineering for the property, the National Construction Code, the Guide to Standards and Tolerances 2017 and the Australian Standard governing the element in question.
0 checkpoints across 0 areas on a standard Schofields defect investigation report. On attached housing we need to know what is yours and what is common property before we attend, because it decides what the report can cover.
No defect grid appears here; the explanation is above.
New Construction Stage Inspections Seven checks through a Schofields build, house or attached.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1, and the strongest set on this site.
Pre-Handover (PCI) Inspections The list before keys, with the lot boundary established first.
Building and Pest Inspections Both inspections in one visit, each reported separately. Instant online pricing, or talk to the booking team on 1300 471 805.
We have not carried out a defect investigation in Schofields. The page stays as text rather than borrowing findings from elsewhere and inviting you to read them as local.
That depends on whether the element is inside your lot or on common property, which the investigation establishes before anything else.
It is written to be usable, though the tribunal wants a report drawn to NCAT Procedural Direction 3, which we prepare as its own document.